Japanese secondary aluminium and aluminium alloy ingot production increased by 0.4% to 65,459 tonnes in January from a year earlier, which increased for the first time in 4 months, according to Japan Aluminium Alloy Refiners Association. The shipment increased by 1.0% to 65,414 tonnes, which increased for the first time in 2 months.
Secondary aluminium and aluminium alloy shipment increased for all applications except for extrusion in January from a year earlier. The shipment for main usage of die-casting increased for the first time in 2 months. The shipment for steel additive recovered. However, the demand slowed down for some applications. The shipment increase for die-casting was narrower at 0.6% than before.M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
« Sep | ||||||
1 | 2 | |||||
3 | 4 | 5 | 6 | 7 | 8 | 9 |
10 | 11 | 12 | 13 | 14 | 15 | 16 |
17 | 18 | 19 | 20 | 21 | 22 | 23 |
24 | 25 | 26 | 27 | 28 | 29 | 30 |
31 |
Japan Steel Scrap Composite Prices (Sangyo Press)
2025/03/27H2 | NewCutting (PRESS) |
41000YEN (-) | 43500YEN (300) |
274.1US$ (-0.7) | 290.81US$ (1.27) |
* Average of electric furnaces steel maker's purchasing price in Tokyo, Osaka and Nagoya (per ton)
- JMB Tieup company
- The Korea Metal Journal
- ferro-alloys.com
- Steel on the net
- AMM
- MEPS